{"id":2454,"date":"2024-06-26T13:17:54","date_gmt":"2024-06-26T13:17:54","guid":{"rendered":"https:\/\/mt-komex.ba\/2024\/06\/26\/celinac-to-get-two-solar-power-plants"},"modified":"2024-06-26T13:17:54","modified_gmt":"2024-06-26T13:17:54","slug":"celinac-to-get-two-solar-power-plants","status":"publish","type":"post","link":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants","title":{"rendered":"\u010celinac to Get Two Solar Power Plants"},"content":{"rendered":"<p>The municipality of \u010celinac is located near <a href=\"https:\/\/energetskiportal.ba\/?s=banja+luka\" target=\"_blank\" rel=\"noopener\">Banja Luka<\/a>, with parts of its territory situated at an altitude of 800 meters, while most of the municipality lies between 300 and 600 meters above sea level.<\/p>\n<p>The lowest point, at 196 meters above sea level, is at the confluence of the Jo\u0161avka and Vrbanja rivers. The region, with its high number of sunny hours, is exceptionally suitable for the construction of <a href=\"https:\/\/energetskiportal.ba\/?s=solarna+elektrana\" target=\"_blank\" rel=\"noopener\">solar power plants<\/a>. It is therefore not surprising that there is great interest in clean energy in this area, with an increasing number of solar installations enabling energy independence for their owners.  <\/p>\n<p>On the hills of the Markovac settlement, the company <a href=\"https:\/\/energetskiportal.ba\/?s=mt+komex+bh\" target=\"_blank\" rel=\"noopener\">MT-KOMEX BH<\/a> has completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants. The total capacity of these solar plants is 280 kWp, and they are built on an area of 3,000 square meters. According to estimates, their annual production will be 360 MWh, providing the investor with energy security. For the construction of these plants, the company used panels manufactured by <a href=\"https:\/\/energetskiportal.ba\/?s=canadian+solar\" target=\"_blank\" rel=\"noopener\">Canadian Solar<\/a>. A total<br \/>of 420 panels were installed, each with a capacity of 660 W.    <\/p>\n<p><a href=\"https:\/\/energetskiportal.ba\/?s=fronius+invertot\" target=\"_blank\" rel=\"noopener\">Fronius inverters<\/a> \u2013 five units, each with a capacity of 50 kW \u2013 were installed on the solar plants. The investor chose to entrust the construction to MT-KOMEX BH, a company composed of a professional team of engineers and installers. They have extensive experience in designing and constructing solar power plants. Additionally, the engineers hold all necessary certifications and regularly participate in professional training and development. They provide services from project design and permitting to the delivery of required materials,<br \/>technology, and workforce to the site.    <\/p>\n<p>The company\u2019s dedicated installers are responsible for setting up the structures and installing panels from reputable manufacturers. This is followed by the installation of inverters and all other necessary infrastructure. The final step is a readiness check for commissioning \u2013 all of these are stages included in the term \u201cturnkey\u201d, and therefore, the responsibility of the entire team. The company firmly believes that <a href=\"https:\/\/energetskiportal.ba\/?s=solarna+energija\" target=\"_blank\" rel=\"noopener\">solar energy<\/a> and green kilowatts are only at the beginning of their expansion in this region. This is evidenced by the growing number of inquiries from both businesses and citizens for the installation of solar panels, whether on rooftops or on land.  <\/p>\n<p>This trend is largely supported by the fact that <a href=\"https:\/\/energetskiportal.ba\/?s=bosna+i+hercegovina\" target=\"_blank\" rel=\"noopener\">Bosnia and Herzegovina<\/a>, like Serbia, has more hours of solar radiation than many other European countries. Additionally, there are large areas of unused land that could be suitable for solar panel installation. The engineers and installers of MT-KOMEX BH are well-equipped to handle all the challenges that come with operating in Bosnia and Herzegovina. They work diligently to promote <a href=\"https:\/\/energetskiportal.ba\/?s=obnovljivi+izvori+energije\" target=\"_blank\" rel=\"noopener\">renewable energy sources<\/a>, respond to all client inquiries, and find the most effective and efficient solutions.   <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The municipality of \u010celinac is located near Banja Luka, with parts of its territory situated at an altitude of 800 meters, while most of the municipality lies between 300 and 600 meters above sea level. The lowest point, at 196 meters above sea level, is at the confluence of the Jo\u0161avka and Vrbanja rivers. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2062,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-2454","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u010celinac to Get Two Solar Power Plants - MT-Komex BH<\/title>\n<meta name=\"description\" content=\"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u010celinac to Get Two Solar Power Plants - MT-Komex BH\" \/>\n<meta property=\"og:description\" content=\"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\" \/>\n<meta property=\"og:site_name\" content=\"MT-Komex BH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61557102788988\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-26T13:17:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"903\" \/>\n\t<meta property=\"og:image:height\" content=\"575\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#article\",\"isPartOf\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056\"},\"headline\":\"\u010celinac to Get Two Solar Power Plants\",\"datePublished\":\"2024-06-26T13:17:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\"},\"wordCount\":464,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/mt-komex.ba\/en#organization\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\",\"url\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\",\"name\":\"\u010celinac to Get Two Solar Power Plants - MT-Komex BH\",\"isPartOf\":{\"@id\":\"https:\/\/mt-komex.ba\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg\",\"datePublished\":\"2024-06-26T13:17:54+00:00\",\"description\":\"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.\",\"breadcrumb\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage\",\"url\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg\",\"contentUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg\",\"width\":903,\"height\":575},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mt-komex.ba\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u010celinac to Get Two Solar Power Plants\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mt-komex.ba\/en#website\",\"url\":\"https:\/\/mt-komex.ba\/en\",\"name\":\"MT-Komex BH\",\"description\":\"Zajedno gradimo budu\u0107nost\",\"publisher\":{\"@id\":\"https:\/\/mt-komex.ba\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mt-komex.ba\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mt-komex.ba\/en#organization\",\"name\":\"MT-Komex BH\",\"url\":\"https:\/\/mt-komex.ba\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png\",\"contentUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png\",\"width\":800,\"height\":353,\"caption\":\"MT-Komex BH\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=61557102788988\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/mt-komex.ba\"],\"url\":\"https:\/\/mt-komex.ba\/en\/author\/novimt_admn\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u010celinac to Get Two Solar Power Plants - MT-Komex BH","description":"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants","og_locale":"en_US","og_type":"article","og_title":"\u010celinac to Get Two Solar Power Plants - MT-Komex BH","og_description":"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.","og_url":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants","og_site_name":"MT-Komex BH","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61557102788988","article_published_time":"2024-06-26T13:17:54+00:00","og_image":[{"width":903,"height":575,"url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#article","isPartOf":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants"},"author":{"name":"admin","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056"},"headline":"\u010celinac to Get Two Solar Power Plants","datePublished":"2024-06-26T13:17:54+00:00","mainEntityOfPage":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants"},"wordCount":464,"commentCount":0,"publisher":{"@id":"https:\/\/mt-komex.ba\/en#organization"},"image":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage"},"thumbnailUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants","url":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants","name":"\u010celinac to Get Two Solar Power Plants - MT-Komex BH","isPartOf":{"@id":"https:\/\/mt-komex.ba\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage"},"image":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage"},"thumbnailUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg","datePublished":"2024-06-26T13:17:54+00:00","description":"On the hills of the Markovac settlement, the company MT-KOMEX BH completed the construction of the Markovac Jungi\u0107i and Markovac Jungi\u0107i 1 solar power plants.","breadcrumb":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#primaryimage","url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg","contentUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/20240414_191243.jpg","width":903,"height":575},{"@type":"BreadcrumbList","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/26\/celinac-to-get-two-solar-power-plants#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mt-komex.ba\/en"},{"@type":"ListItem","position":2,"name":"\u010celinac to Get Two Solar Power Plants"}]},{"@type":"WebSite","@id":"https:\/\/mt-komex.ba\/en#website","url":"https:\/\/mt-komex.ba\/en","name":"MT-Komex BH","description":"Zajedno gradimo budu\u0107nost","publisher":{"@id":"https:\/\/mt-komex.ba\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mt-komex.ba\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mt-komex.ba\/en#organization","name":"MT-Komex BH","url":"https:\/\/mt-komex.ba\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/","url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png","contentUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png","width":800,"height":353,"caption":"MT-Komex BH"},"image":{"@id":"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61557102788988"]},{"@type":"Person","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/mt-komex.ba"],"url":"https:\/\/mt-komex.ba\/en\/author\/novimt_admn"}]}},"_links":{"self":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts\/2454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/comments?post=2454"}],"version-history":[{"count":0,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts\/2454\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/media\/2062"}],"wp:attachment":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/media?parent=2454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/categories?post=2454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/tags?post=2454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}