{"id":2453,"date":"2024-06-27T13:20:38","date_gmt":"2024-06-27T13:20:38","guid":{"rendered":"https:\/\/mt-komex.ba\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion"},"modified":"2024-06-27T13:20:38","modified_gmt":"2024-06-27T13:20:38","slug":"the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","status":"publish","type":"post","link":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","title":{"rendered":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion<br><br>"},"content":{"rendered":"<p>MT-KOMEX, together with the company MT-KOMEX BH, is nearing the completion of the construction of the Re\u0161etnica Photovoltaic Power Plant (PVPP), located in the settlement of the same name in the city of<br \/>Gora\u017ede.<\/p>\n<p>This solar power plant in the Bosnian-Podrinje Canton is also<a href=\"https:\/\/energetskiportal.ba\/?s=solarne+elektrane\" target=\"_blank\" rel=\"noopener\"> the largest solar power facility<\/a> within the system of JP Elektroprivreda BiH d.d., Sarajevo, which is the investor of the project.<\/p>\n<p>Re\u0161etnica is situated at an altitude of 900 meters on a plateau covering 10,000 square meters. From the outset, the project encountered numerous challenges, which were all successfully overcome.<\/p>\n<p>The solar power plant was built as a turnkey project, meaning that MT-KOMEX was responsible for planning and developing the plant model, delivering materials, selecting technology, installing panels and supporting structures, placing inverters, and providing all other necessary equipment and infrastructure.<\/p>\n<p>It is estimated that the solar power plant will produce an annual energy output of 1,411 MWh, which is sufficient to meet the <a href=\"https:\/\/energetskiportal.ba\/?s=elektri%C4%8Dna+energija\" target=\"_blank\" rel=\"noopener\">electricity<\/a> needs of approximately 350 households.<\/p>\n<p>For the Re\u0161etnica PVPP, 2,340 photovoltaic panels manufactured by Aiko, each with a capacity of 450 W, were installed. Huawei inverters are responsible for converting current and connecting to the<a href=\"https:\/\/energetskiportal.ba\/?s=elektroenergetske+mre%C5%BEe\" target=\"_blank\" rel=\"noopener\"> power grid<\/a>.<\/p>\n<p>This project required the construction of a special mounting structure adapted to the local meteorological conditions.<\/p>\n<p>\u201cA custom structure was built and additionally reinforced due to the specific terrain and snowfall during winter,\u201d said representatives of MT-KOMEX BH.<\/p>\n<p>MT\u2011KOMEX zajedno sa kompanijom <a href=\"https:\/\/energetskiportal.ba\/?s=mt-komex+bh\" target=\"_blank\" rel=\"noopener\">MT-KOMEX BH<\/a> uspje\u0161no je savladala monta\u017eu konstrukcije i panela na terenu koji je pod velikim nagibom, a koji ide i do 15 stepeni sa orjentacijom prema jugu, dok su obi\u010dno mjesta za solarne elektrane sa manjim nagibom.<\/p>\n<p>Mo\u017ee se re\u0107i da FNE Re\u0161etnica zbog svog terena spada u mjesto prili\u010dno zahtjevno i nepristupa\u010dno za izgradnju, te zavr\u0161etak ovog projekta i pu\u0161tanje u rad solarne elektrane prestavlja uspjeh za izvo\u0111a\u010da ali i investitora.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MT-KOMEX, together with the company MT-KOMEX BH, is nearing the completion of the construction of the Re\u0161etnica Photovoltaic Power Plant (PVPP), located in the settlement of the same name in the city ofGora\u017ede. This solar power plant in the Bosnian-Podrinje Canton is also the largest solar power facility within the system of JP Elektroprivreda BiH [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-2453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion<\/title>\n<meta name=\"description\" content=\"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion\" \/>\n<meta property=\"og:description\" content=\"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\" \/>\n<meta property=\"og:site_name\" content=\"MT-Komex BH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61557102788988\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-27T13:20:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#article\",\"isPartOf\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056\"},\"headline\":\"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion\",\"datePublished\":\"2024-06-27T13:20:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\"},\"wordCount\":333,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/mt-komex.ba\/en#organization\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\",\"url\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\",\"name\":\"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion\",\"isPartOf\":{\"@id\":\"https:\/\/mt-komex.ba\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg\",\"datePublished\":\"2024-06-27T13:20:38+00:00\",\"description\":\"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.\",\"breadcrumb\":{\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage\",\"url\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg\",\"contentUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg\",\"width\":1600,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mt-komex.ba\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mt-komex.ba\/en#website\",\"url\":\"https:\/\/mt-komex.ba\/en\",\"name\":\"MT-Komex BH\",\"description\":\"Zajedno gradimo budu\u0107nost\",\"publisher\":{\"@id\":\"https:\/\/mt-komex.ba\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mt-komex.ba\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mt-komex.ba\/en#organization\",\"name\":\"MT-Komex BH\",\"url\":\"https:\/\/mt-komex.ba\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png\",\"contentUrl\":\"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png\",\"width\":800,\"height\":353,\"caption\":\"MT-Komex BH\"},\"image\":{\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=61557102788988\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mt-komex.ba\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/mt-komex.ba\"],\"url\":\"https:\/\/mt-komex.ba\/en\/author\/novimt_admn\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion","description":"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","og_locale":"en_US","og_type":"article","og_title":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion","og_description":"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.","og_url":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","og_site_name":"MT-Komex BH","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61557102788988","article_published_time":"2024-06-27T13:20:38+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#article","isPartOf":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion"},"author":{"name":"admin","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056"},"headline":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion","datePublished":"2024-06-27T13:20:38+00:00","mainEntityOfPage":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion"},"wordCount":333,"commentCount":0,"publisher":{"@id":"https:\/\/mt-komex.ba\/en#organization"},"image":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage"},"thumbnailUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","url":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion","name":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion","isPartOf":{"@id":"https:\/\/mt-komex.ba\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage"},"image":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage"},"thumbnailUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg","datePublished":"2024-06-27T13:20:38+00:00","description":"MT\u2011KOMEX i MT-KOMEX BH privodi kraju izgradnju Fotonaponske elektrane (FNE) Re\u0161etnica, u istoimenom mjestu u gradu Gora\u017edu.","breadcrumb":{"@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#primaryimage","url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg","contentUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Gorazde.jpg","width":1600,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/mt-komex.ba\/en\/2024\/06\/27\/the-largest-solar-power-plant-project-in-the-elektroprivreda-bih-system-nears-completion#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mt-komex.ba\/en"},{"@type":"ListItem","position":2,"name":"The Largest Solar Power Plant Project in the Elektroprivreda BiH System Nears Completion"}]},{"@type":"WebSite","@id":"https:\/\/mt-komex.ba\/en#website","url":"https:\/\/mt-komex.ba\/en","name":"MT-Komex BH","description":"Zajedno gradimo budu\u0107nost","publisher":{"@id":"https:\/\/mt-komex.ba\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mt-komex.ba\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mt-komex.ba\/en#organization","name":"MT-Komex BH","url":"https:\/\/mt-komex.ba\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/","url":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png","contentUrl":"https:\/\/mt-komex.ba\/wp-content\/uploads\/2024\/07\/Logo.png","width":800,"height":353,"caption":"MT-Komex BH"},"image":{"@id":"https:\/\/mt-komex.ba\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61557102788988"]},{"@type":"Person","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/a6684c76a9ea5f0ef69e61fa73085056","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mt-komex.ba\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a3e2cad39e580dc89ffbb2a7fc75627936b4cc6398753b3c8ba6138f68a8069?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/mt-komex.ba"],"url":"https:\/\/mt-komex.ba\/en\/author\/novimt_admn"}]}},"_links":{"self":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts\/2453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/comments?post=2453"}],"version-history":[{"count":0,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/posts\/2453\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/media\/2063"}],"wp:attachment":[{"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/media?parent=2453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/categories?post=2453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mt-komex.ba\/en\/wp-json\/wp\/v2\/tags?post=2453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}